Welcome to SVCS SOLAR-SA

SVCS SOLAR-SA

Fabricated and installed solutions, supplied and fitted by our own teams.

A normal Gauteng house · 30 kWh a day

Most of your bill happens in daylight.

Which is the whole opportunity. Move the geyser and the pool pump onto a daytime timer and they run straight off the roof — so the battery only has to carry what is left after dark, about 16.5 of your 30 units. That is why our banks come out smaller, and cheaper, than most quotes you will have seen.

00:00 06:00 12:00 18:00 24:00 3 kW 2 kW 1 kW 0 Your array Evening peak — battery
Solar generation What the house draws Still bought from the grid
Cut the bill

Panels and a battery

Most of what you use in a day comes off the roof instead of the meter, and the battery covers the evening peak — which is the expensive part of the day.

See these packages →
Backup

Battery, no array

Carries the house through load shedding. It does not lower what you pay — we would rather say so now than have you find out on the next bill.

See these packages →
Off grid

Standing on its own

Enough array to make more than you use, and a bank sized to finish the night with capacity still in it rather than flat by morning.

See these packages →
What we check before you see a price

Every design, against the machine’s own limits

String voltage on the coldest morning of the year vs the MPPT window
Array size against the inverter’s PV input limit checked per MPPT
Battery cable against the rated charge current 135 A → 50 mm²
Fuse and disconnect paired to that cable 160 A NH00

That check is the difference between a system that runs quietly for ten years and one that clips every summer afternoon. If a combination will not work, it never gets offered to you in the first place.

One price, the whole job

Every package on this site is a complete installation, not a box of parts. Prices are shown excluding VAT with the including figure underneath, because most of our customers claim it back.

  • Inverter
  • Batteries
  • Panels
  • DC protection
  • AC protection board
  • Cable and lugs
  • Roof mounting
  • Earthing
  • Delivery
  • Installation
  • Certificate of Compliance
DEYESunsynkJA Solar Canadian SolarVoltaGreenRich

We were steel first

Carports, gates, fencing, staircases, balustrades and renovations. If your panels are going on a carport, the same people build the carport.

Straight about stock

Some of what we sell is on our own shelf and some sits with our supplier. We say which. Once your deposit reflects we need 24 to 48 hours to have it ready, and we confirm the date with you before you travel.

Talk to us about your project

Collection from Alberton. Gauteng delivery available at an additional charge.

Get in touch